|
|
 |
BFS Home Page > eStore Home Page > Plyometrics and Speed
Heavy-Duty BFS Push/Pull Sled w/ Harness and Lead |
Usually Ships Within 48 Hours
|
|
|
 |
- Includes Harness and Lead
- Heavy 11 Gauge Steel Tubing
- Long-Lasting 3/8" Solid Steel Slide Plates
- Twice as Long Lasting as Aluminum
- Built to be Used on Concrete, Asphalt, or Any Hard Surface
- High Vertical Handles and Low Horizontal Handles
- Pull Harness Attachment Position
- Dual Olympic Plate Holders
- Develop Explosive Power in LEGS and HIPS
|
(Usually Ships within 48 hours)
|
|
|